Thursday, July 11, 2013

Magic Kingdom

Today we worked on our 2nd site with Chris's crew. On our first site, we replaced the bathroom floor and put new laminate floors down in the laundry room. We really made a connection with the little girl Zoe Beth and her adorable cat named Kitty. On breaks, we would often play with both of them and created a strong bond between us. On our second site, there is also another adorable girl named Becky. Making connections and building relationships with the family is one of our favorite parts of ASP. Today was a longer day and we got a lot of work done. We worked on the foundation of the house. In order to support the house, we needed to dig fifteen oles and put 6x6's in them. We then secured the wood using concrete. Overall even though it was a long and tiring day, we had a lot of fun. -Becky. Note that the Magic Kingdom hails the following constituents: Keith B., Lee G., Carsten B., Tyler S., Will E., Becky C., Rachel S.

Mr. Rogers: Why we come on ASP (Audio blog!)

John Almendinger and Stacy Brenes reflect on what brought them to ASP and what keeps them coming back.  


Little House on the Prarie

ASP has changed me very much.  Seeing the conditions that these people were living in really makes you realize how good you have things.  While at Little House, we needed to take off and replace tin on an extremely steep roof.  We also needed to demolish a chimney.  Everything on this roof was dangerous.  The tin could come off with a little bit of rain and the chimney we took down by picking pieces apart.  This is not safe for a family of four.  Putting on the new tin felt just as good as taking it apart.  it felt good because I knew that the family will be safer and drier for a very long time.  That chimney will no longer be a hazard.  Because of ASP, this family will soon be living in a house that is not dangerous and they will be warmer, safer and much drier.

John Aceto.

Note: the Little House work crew consists of: Doug F., Joe D., Doug O., Lee G., Nick B., John A., Jamie O., Jenna D., Sarah E.




Wednesday, July 10, 2013

The King

Our crew consists of Ryan F., Laura G., Dave H., Jeff G., Kevin S., Matt D., and Heather A.  Our job sites name is called The King.  We had no idea shy until we walked into our homeowner's Don's house.  He has everything you can think of in the form of Elvis!  Don is pretty quiet, but is one of the nicest guys in Virginia.  This week we were given the task to "gently remove" his old tin roof, add underlayment, then install a new tin roof.

The week thus far has been pretty eventful.  the first day was the day of the bee!  We removed all the tin and started to lay the underlayment, then the bees came.  Dave, Kevin and Ryan were casualties to the bumble bees!

The second day we continued to add underlayment.  This made it pretty tricky to navigate the roof, but we managed!  There are a few hols in the roof that made a few people slip, thankfully we have a talented experienced roofing crew.

Today we had a little bit of misfortune with the rain.  We had just started tinning when the lightning came.  Our house leaked a little, but Don said The King has been through worse!

We plan on finishing the whole roof by Friday.  Don can't wait to see it finished and neither can we!

Ryan

Bambi

Greetings everyone!  Danika and the Contructacons here!  We've had a very busy week so far and quite a bit to share.

This year, our group (Andy b., Rich e., Kelsey S., Liam N.,, Timmy G., Matt S. and myself (Danika NY.) were assigned two homes to work on.  We started and Don's house, where we gently removed rotting wood from the underside of his porch roof and replaced it with plastic sheeting.  The first day on site, we didn't really see Don, because he stayed inside until after lunch and sat on his front porch while we worked in back.  All he really told us was that he'd have venison jerky for us the next day.

Tuesday came and we began painting the seething and building a book shelf for Don's porch.  His friend Toni had come over and both men came out to join us for lunch (as well as Don's cat, Huckleberry.) Our crew munched on PB&J, chips and venison jerky as Tom entertained us with stories of his younger days.  Then Don spoke.  He said he had something he wanted us to hear.  I could tell he really wanted us to listen to what he was about to say so I looked up as he began his piece.

  "In all the Universe, in all time, you are the only you.  Never
   before have molecules come together exactly like you.  Never
   again will your footsteps be repeated upon this earth.  Your
   strength is a strength someone can count on.  Your love is a
   love that can make a difference  Your life is a life that can
   move the whole world for the better.  Do you dare to
   make the difference that only your can make? ...Say yes"

We were all speechless.  Don told us that it was a piece of prose he had heard years ago and now carried in his heart.

That moment of sharing make ASP worth it for our crew.  I later asked Don to repeat what he had said, "If you promise to share it, I'll give your my copy", and he did.  And now here I am, sharing this beautiful message with all fo you at home, because I feel it speaks perfectly to what ASP is all about whether you travel out of state or support from home, please always remember to "say yes."

Rambo

(Paul, Nancy, Matt C., Conner D., Austin, Nicholas W.)

Over the past 3 days, our group has become real close to our "eccentric" grandma.  She is a wonderful person who is in touch with her comical side.  she refers to herself as "Rambo."  She has a passion to protect us from the snakes and spiders, even telling us stories on how she kills them.  This eases our fear of the poison snakes and spiders.  Now our project has to add a floor to her closet, paint her shelves and add support to the foundation.  "Rambo" screamed in joy as we worked hard to accomplish these tasks.  This being my first year, I have truly seen the hardships of this area.  As for Nicholas, he has once again loved helping others in need.  As a group we have striven to make "Rambo's" life better. . . even in the pouring down rain.  While we still have a few more days on the site we have already accomplished a lot.

The Jungle

Our work crew "The Jungle"  has been met with a series of challenges and surprises at the beginning of the week.  We were told that we had to fix the foundation of a house and finish a drainage ditch that was "supposed" to already be a foot wide and 18 inches deep.  When we arrived on Monday morning that was not the case.  The drainage trench was barely 3 inches deep.  So most of Monday consisted of finishing that.  Our first set back.  When checking out the foundation problem we realized it was a lot more difficult than we were told.  Fixing a foundation really meant saving this woman's house from collapsing any second without injuring any crew members.  Set back number 2.  Our fearless leader Chris had to work extremely hard to figure out a plan that kept everyone and the house safe, which was not an easy task.  But we knew he could do it and sure enough Tuesday night we had a plan and a little spark of hope that this seemingly impossible job could be done.  Come Wednesday morning we began constructing the structures that would hold (or not) the house.  Once we had enough build we put the first one in and started to jack up the house.  Little by little the house lifted and was being held by hour newly built structures.  It worked!  After what seemed like hours jacking up the house everyone's heart could finally beat at a regular pace knowing we did it.  We could only celebrate for a minute or so because there was a lot of work left to be done and only seven of us.  There had been rumors that we might be getting another crew to help us but it wasn't definite so until then we just had to keep truckin' on.  We took a break for lunch and stopped back at the center for a much needed bathroom break and when we arrived back at our site there was another crew waiting for us.  It was an unbelievable feeling knowing we had more hands to help and that our job could really be completed.  Those two set backs in the beginning weren't even relevant to us now, and that little spark of hope transformed into reality.  The second part of the week will not be easy and we will have to overcome more challenges but we'll get through them whatever it takes just like in the beginning of the week.  That's the thing about ASP and our church family when someone is struggling there are many people who are ready to help out.  That's the true joy of ASP.

-Kira

Note:  The Jungle team consists of Chris A., Melissa B., Kyle B., Andy G., Zach B., Mary H., Kira B.

FAYGO

In 2012 the greatest discovery since sliced bread was found in Warfield, Kentucky.  The diamond in the rough was found on the ASP trip in a 25 cent soda machine.  It was the ultimate drink, Faygo Peach Soda."  When we left we had bought every can we could find.  To your horror we discovered that this nectar of the gods was not available in New Jersey!  So the search began.  With no luck, we were found to be "Faygo Less!"

As we prepared for this year's trip, the though of restocking our stash was in our minds.  Once again to our horror we found no Faygo when we arrived here in Jonesville.  A substitute needed to be found to quench our ravenous thirst.  To our good fortune we found 2 worthy candidates:  "Walmart's" no brand and Peach NEHI.  They were worthy substitutes but Faygo was still in our hearths and taste buds.  To our great fortune we unearthed "6 rare bottles of the amazing and "DEE-LISHUS" Faygo.





Now we had to prove that Faygo was truly the best of the best.  So what do we do?  A taste test was the only solution.  On the evening of July 9, 2013 a fourth candidate emerged.  It was the dark hour "Best Choice Peach Soda."  The battle was about to begin.  With 2 completely impartial judges who were the only ones to know the true line-up, we could begin.

 Up to 7 testers were assembled when the smoke cleared Faygo stood alone.  Walmart and NEHI battled well while Best Choice, just stunk.  There was elation and some sadness in the outcome.  We're happy that Faygo is now proven to be king, but now we're back to trying to find more to bring home.  I guess that's the way life works.

Signed Faygos 3 best customers:
     Rachel Shafer
     Emily Bowers
     Andy Biedermann

P.S.  Stay tuned for the greatest soda challenge know to man.  Faygo takes on all comers on this planet and any other!!!!

Tuesday, July 9, 2013

Taj Mahal

Our job is to gently remove a front porch and replace it with a new one. We are also assigned to finish a floor in their house as well as put the finishing touches on the ceiling. Jack, Jon and Chelsea gently deconstructed the old porch and almost finished rebuilding the new porch by the second day. Erin and Kaelin have completed the wood floor and painted the ceiling also in the two day period. Kathleen and Laura played with the young children of our family. Kathleen and Austen, who is 4 years old collected crickets and other bugs. Laura taught Desiree to pump on a swing and chased her around the house trying to keep her out of the work zone and out of the hair of our family's mother Rachel. She has recently been troubled by back issues and is an extreme amount of pain. Our group has also had the pleasure to meet Rachel's parents, who visited and took the whole family to their house up the road so the children could go swimming and Rachel could rest. Marlin, Rachel's brother has been to the house helping Rachel with caring for her family and helping our group as well.

Laura Shreve, Jack Guild, Kathleen Mulvihill, Chelsea Sebastian, Erin Cascio, Jon Adams, Kaelin Jennison

This experience has been amazing so far. Our family has been great, the children are absolutely adorable, the dogs on our site are cute as ever, and we are getting so much work done in just two days. Each year is different, but there is something about this year that I can't put into words. On the end of the day on Monday night, I was happier than ever. Everything was falling into place and I was so excited. I always look forward to ASP, and there are a lot of changes this year but I have had a smile on my face ever since we left Saturday morning. We are all like a family here, and it feels great to have so many people that are all here because we love what we come here to do. It really is a life changing experience. This will be my sixth year coming on ASP and it has changed me as a person. There is no better feeling than knowing you are making a difference in somebody else's life. We had our prayer walk today and I also try to reflect on not just what I'm doing, but my life as a whole. I came with a smile on my face, and it has not gone away. I'm ending this with love and a hug because my reflection today really made me appreciate life and what we are here doing. I haven't sat down and thought about a lot of things for a long time, but getting a chance to walk around every station made me open my eyes even more to what I am grateful for. I am here for a reason, and I'm thankful for the opportunity.

Chelsea Sebastian




Double Trouble Blog, by Stacy Brenes

(Note, Double Trouble is a name chosen by the group, the ASP work-site group name is Mr Rogers)

In two days, I've gotten to get a glimpse of the relationship between our humanity and God.  My crew is working on a roof, a bathroom and a porch.  On the first day a couple of us began to "gently remove" the porch in order to rebuild a new one.  In the midst of the debris, I realized that we are like the porch that we are working on.

Some time ago, the porch was built shiny and new on a sturdy foundation; yet years of storms, floods and use allowed for the porch to become weak.  Water seeped into the ground and caused it to slide;  it seeped into the crevices of the wood and caused it to rot;  it rusted the nails and made the gutters fill with grime.  After years of neglect the porch was no longer the strong, sturdy porch that the carpenter had once made. our homeowner saw this, he added a porch swing, decorations, and laid a new board to lay atop of the rotten ones and though the porch looked better, the rot, rust and grime still lay beneath all of the superficial changes.

As we tore through it I realized how we are a reflection of this porch.  God created us, strong and with purpose; yet sins, tribulations and neglect of our spirit and faith leave our souls, hearts and minds in the same position that the porch is in.  Some of us try to cover our sins, we mask our errors, our mistakes and our past and are superficially okay but spiritually broken.  Yet it is only until we have hit rock bottom that we cry out for God to help.  On the porch, I realized that as people, we fail and we sin, but God repairs and restores.  In the same way that my crew removed the porch, God removes our sin.  He takes it all away, and like our homeowner, we stand on the sideline weary and torn, because all we see is the destruction of all we've ever known; all that we've ever been.  But God is a God of wonders, and in the same way my crew did today, he remakes our foundation so we can stand tall again, he constructs us with pressure treated wood and galvanized nails to prevent us from rotting or rusting.  He builds us new, our neglect and sin is forgiven and no longer exists; and though we will sin again; storms and tribulations will com, we will be prepared for it;  because through him we are no longer a weak people of sin, but a strong people of God.





Here is the porch today.  The Crew at this site is a double crew consisting of: Stacy, Blair, Samantha, Lindsey, Brian, Sydney, Rob, Conner B., Zak O., Mickey, John A., Linda O., Linda B., Bill D.

EG* on the porch.   (Evening Gathering)

Monday, July 8, 2013

Monday night hangin' on the porch.


Sundance Bonito

Our crew "Sundance Bonito" consists of Dan, John O, Taylor, Josh, Emily, Max and me Caleb our job is to reside an old house for this guy named Bruce and his wife Janice. Our awesome crew took on the first day with pride, power, determination and team work. We showed up at the house and instantly got unpacked and to work on the sides of the home. As we worked we joked around and talked to our home owner and got most of the water proof covering stapled to the house. As we worked we had this very cute dog watching us through the windows all day long. As we worked on the sides we had to move objects like tires and toys and boxes away from the sides of the house. One of my crew members reached for a tire to move it and I noticed that there was a spider on the tire so I said to stop and they asked why and I pointed out that the spider was a black widow.
Well that was enough excitement for one day so we moved the tire and the spider away from the site. Our day ended well with most of the water proof covering done and the siding ready to be put up. Our jobs not finished but we did good for today and there is much more excitement to come in the following days. We all can't wait for tomorrows work.


O' Brother

"O, Brother" consists of John C., Sue F., Kalyn N., Katy G., Chelsea F., Mike B., and Billy G.  Since today was our first day, we weren't sure what to expect.  It was a slow start, but everyone quickly changed gears.  Katy, Kalyn and Billy are in charge of sheet-rocking and spackling one room of the house, while Sue, John, Chelsea and Mike replace the floors in the kitchen.  There is a lot to do, but we couldn't be happier to be on ASP again!  Our family is two of the nicest ladies.  Getting to know them and see how much they appreciate the work that we do is the biggest reason why we choos to come back year after year.  Although we suffer through frustratingly crooked rooms, heat and bug bites, we still look forward to going back the following day.  Now that we have a plan, we feel confident that we can finish what we set out to do.

Kayln


Animal House

(Dave, Rob, Arthur, Emily, Eric, Julia)
Even though it is only day one, I can tell we are all in for a great week.  We were lucky enough to be given a great center and a kind staff.  Our work site has a spectacular view of the mountains, and best of all, an amazing family.  The owners, Mary and Joe, built the home themselves and take a lot of pride in it.  Still, they welcomed us with open arms and many thanks.  Mary is currently suffering from cancer, but her amazing spirit does well to hide it.  Whenever we saw her, she would always have a smile on her face and has an amazing talent of making that smile contagious.  I am very thankful to have met herr and Joe, and the painted hand-prints of previous ASPers.  These along her fence shows her appreciation of their great organization (ASP).  While it was plenty hot on the tin roof we're replacing, ASP is one of the coolest things a person can do with their summer.

Arthur.

Saturday, February 23, 2013

ASP Winter 2013 - Friday, Saturday


Our final day was a full work push to complete a variety of projects.
   
Tim set Mary up to lead the evening prayer before dinner - to which she rose well to the occasion.  
We had the opportunity to invite our families to the center for dinner and a presentation from John and "the famous" DJ - panther wrestler.  It was wonderful to sit down to share a family style meal and coffee with them.   

George made a warm welcome to Donna and her daughter in law Nikki and two of her children Hanna and Joseph who just turned 10 on Thursday, and little Joshua Donna's grandson who is three but could only hold up two fingers at a time!  
Following that the evening ended with card playing, guitar playing, singing, and always, always sprinkles of laughter.
  
Saturday morning both the 6:00 am departure group and the 7:00 departure group got a wake up call at 5:25 ( that's A.M.) from the building alarm system.... This author doesn't know for sure but rumor has it Mickey set it off! Val's response was "geeez you guys, do we really need the lights on?   
Steve relayed that this trip at such a needed time, to do and think and act about the important things in life. He did a wonderful job of leading devotions for the group each day, and we thank him.  
Mary and Debbie set off with John Casale , Sue Anderson and Tim Buckley in the lead.   
The remaining caravan of John A, Betsy, George. And Val, Steve, Mickey. and   Kerry, Mark and Johnny O will be departing with bittersweet feelings to be consoled by breakfast at Biscuit World!   

-Betsy K.

Friday, February 22, 2013

ASP Winter 2013 - Thursday


Thursday team 2 was finishing up projects at Mary Beth's house.   It was difficult to anticipate leaving her on Thurs and starting a new project with a new family on Friday.  So they kept looking for projects to fix and make better and complete.  The team had put in a new window so they went to Magic Mart to get a curtain rod and curtains for the window.  Sue Anderson also painted a vine scroll on the window molding to match the curtain.  The team had an emotional prayer shawl presentation to Mary Beth.  Mary Beth then told the team her good news.... She had worked out a payment arrangement with the power company so her electric power would not be cut off AND she got a job!    Praises and Thanks!!!

Steve and Big John continued working on the electric at Nicky and John's house (Donna's son and daughter in law).  They have been raising their 3 children in a house whose service is fed from the house in between Donna and Nicky's house via an extension cord.  Imagine trying to wire a home that is already built, occupied and has been in place for decades!  

John A didn't see the light of day for more than 15 minutes yesterday.  He was running plumbing lines at Nicky and John's house in the basement all day.  There was a failed attempt to snake out the waste line that is backed up....but the manual snake could not get through the plug.  If ASP can not find a power snake to rent for the day, the pipe will need to be cut at the point of back up and new pipe installed.  

Mark and Mickey needed a 2x10 to replace a rotten floor joist at Donnas ....Donnas husband Troy led them to the house in between where the two families had been storing supplies for projects on their houses. And there was a 2x10 that was just long enough for the span!  They cut and placed subfloor and Mark took on the task of stapling in netting on the joist that would hold the insulation under the subfloor.  George and Debbie cut and installed insulation for that back room and cut the paneling to be installed on Friday.  

We came home to an evening of bluegrass with the Blue Grass Cross Ties.   ASP staffer Mary also loves blue grass and Bertha and Burt (husband and wife lead singers) called her up to play with them.   Mary gave her guitar to John A ( the strap being set for little tiny Mary set the guitar around John's neck!) who proceeded to keep up with them and thoroughly enjoyed the opportunity to play!

The entertainment was followed but another thank you and welcome to the new crew that had just arrived from DC from Mary (our Mary this time, and first time ASPer) with a DQ ice cream cake.   

-Betsy K.

PS: John Casale and Steve Yacik spent the first day installing a door at the trailer home of Don and his family. Don is a widower in his mid-seventies. His family consists of his daughter, Brenda, and son, Stevie. They are warm, friendly and love to give hugs. At one point during the installation of the door, a tearful Brenda explained to John and Steve that the trailer is painted bright purple because it was her late mother's favorite color.

When John and Steve went to pick out a prayer shawl for Don, Brenda and Stevie, at the top of the bag of shawls was a beautiful one knitted by Rose Suits. It's color? Bright purple.

Thursday, February 21, 2013

ASP Winter 2013 - Wednesday

Work is rocking and rolling here. ASP staff THE BEST EVER. We are getting more work done than expected and we see the staff several times each day- bringing supplies, advising next steps, visiting with us and families.

Amazingly, at 5:35 when I came down to cafeteria, only evidence of life was coffee made and Mickey's butterscotch krimpets out! We are tired but as usual enjoying the opportunity to be here in this place at this time. What a blessing!

So. I dont have a report now from the other teams, but can relay Team 1 Wednesday progress

Kerry. Debbie and Betsy competed the back porch railing. George and homeowner Troy tackled the bathroom tile.
John A and Big John and Steve went to John and Nicky house two houses down from our site.
They are the son and daughter in law of Donna and Troy at our site. That group has put in new electrical service, established new hot and cold water lines, new lines for washing machine and hot water heater.

At Donna's we moved the roof trash pile from the back patio to the street, and put new layer of T111 on exterior of back porch.

Mark, Mickey and George removed the appliances in the back porch and the flooring that needs to be replaced. Measurements were taken for new door that had been kicked in preceeding a burglery. A floor board in deck was removed and replaced and the siding was painted...one coat for now.

Peace to all our friends and family at BBPC!!

- Betsy K.

Wednesday, February 20, 2013

ASP Winter 2013 -- Day 4




John Omelias crew leveled the floor in the closet. They installed a new window that appeared to be the cause of the leak that led to the floor needing to be replaced. We replaced a light fixture in the bedroom. On the back porch, the homeowner was so thrilled with the floor, she looked up and said now she had to paint the ceiling, to which Mary defensively told her - not without a drop cloth you don't! Big John and Steve finished the trim on the new door.

There was a very emotional presentation of a purple Prayer shawl to Don.  His daughter ran out crying saying that her mother had painted the house purple and then died a few months later. Don got his guitar and played bluegrass for the two. Then they went over to check out the electrical box at Nicki's house.

She is the daughter in law of Donna - the homeowner where Team 1 is working. There they helped Kerry, Debbie and Betsy with their railing project by (gently?) removing the back Porch railing. Mark and Mickey started the day painting a few sheets of T111 siding which they proceeded to cover an exposed wall, currently covered in asbestos siding. They also lent a hand in the railing project.

John and George and Donnas husband Troy did some piping under the house in order to line up the Waste pipe and installed a new flange on the toilet. John was then also called over to Nicki's House to strap up pipes and electrical hanging in the basement and then drilled holes in the floor in order to run new pipes.

Debbie, Kerry and Betsy completed the spindles and top railing on the front of the porch and ripped more spindles, pre -drilling holes for the spindles to go on the back railing the next day.

The day overall brought a lite drizzle in the morning - cold and windy, followed by sun followed by outright rain followed by warm sun and then hail (no, I can't make this up!) then a little light drizzle and wind again and warm sun and then I clouded over before we cleaned up and headed back to the center.

One group watched October Sky and another group retreated to the cafeteria to play a few rousing card games - Nicole from the staff taught them a new game Euker.

 - Betsy K.

Tuesday, February 19, 2013

Winter ASP 2013 -- Days 2 & 3

So we arrive Sunday and enjoyed meeting the staff and admiring all the updates to the center.
Monday we headed out to meet our families with the staff. At DP site team 1 divided into 3 work groups. John A and George Hellerman tackled the bathroom. The floor is rotten and the cast iron waste line is about 14 inches from the back wall where it should be 10 to 12 inches. Mark Huddell and Mickey Hauer took charge of repair of the roof. They started with a 3x3 section but ended up replacing the roof deck and singles over a 10x10 area. Betsy, Kerry Huddell and Debbie Fry gently removed one portion of a deck railing and end floor board. They ripped 2x4s into porch spindles and secured 3 new railing posts to the porch.

John Casale and Steve Yacik went to another site where DT welcomed them with many hugs and a few tears. They replaced a door, having to temporarily leave the new opening while temperatures outdoors were 15-20 degrees (F) until a door could be secured to fit the opening.

Team 2 went to another site. Tim. Sue. Val Mary John O replaced a laminate floor in a bedroom and cleaned out closet to prep for new flooring. They put closet belongings into bags and moved to another room to prepare for new flooring there too. There was ongoing water damage surrounding a window which would have ruined the new floors going in, so the team waited to show the situation to Nicole. She is one of two Asp construction manager staffers. So the area was prepped for a new window and the team patced the area until Tuesday when a new window can be installed. Tuesday work will continue on floor installation.

--Betsy K. 

Winter ASP 2013 -- Day 1


Day 1...blinding snowstorm on 81 followed by dazzling sun so driving was a challenge.
Even more of a challenge for John Casale, Tim Buckley and Sue Anderson who had to leave the highway in search of gas.  

Sweating bullets-they put 25.1 gallons in a 26 gallon tank!   

So Sunday we headed off to the Guyan Valley center with plans to stop for lunch before our arrival.   Following the gps to Hardees along Turkey Creek road the caravan of 5 cars drove 30 minutes along rocky single lane mountain paths. We drove straight into the driveway of a local resident!  Imagine the sight of 5 muddy nj cars roaring to a halt at a dead end and then trying to both turn back and head back along the single lane mountain road

-Betsy K.

Thursday, January 24, 2013